Smart Build Calculators
Building planners

Timber bathhouse planner

Sketch layout and preliminary material estimate

Structural solutions require separate verification.

Editable educational example. All dimensions and assumptions can be changed. This is not a ready construction design.

Building and timber
Room requirements

Internal doors are template-positioned; add a door on p1 or p2 below to override that partition door. Opening offsets follow wall-segment coordinates.

Doors and windows
Opening 1
Opening 2
Roof
Separate terrace
User-marked stove zone
Floor
Ceiling
Interior lining
Additional user waste reserve (%)

v1.0.0 · Geometry checked · Quantity checked · Engineering unverified

BAT-01 sketch layoutExternal 6 × 4 m. Room dimensions are clean internal dimensions. Blue windows and white doors are shown on their wall segments.Terrace 4.00 × 1.50 mVestibule / changing5.70 × 1.22 m6.98 m²Steam room3.08 × 2.38 m7.32 m²Washing / changing2.52 × 2.38 m5.99 m²door 0.7 × 1.9 mdoor 0.7 × 1.9 mdoor 0.8 × 2 mwindow 0.6 × 0.6 mExternal length 6.00 mExternal width 4.00 m · wall 0.150 m

White = doors; blue = windows. All annotations in metres. Room dimensions exclude wall and partition thickness.

External building area
24 m²
Reported footprint
24 m²
Clean room area
20.282 m²
Courses
18
Roof high point
3.333 m
  • Vestibule / changing: 5.7 × 1.224 m · 6.977 m² · 16.744 m³
  • Steam room: 3.08 × 2.376 m · 7.318 m² · 17.563 m³
  • Washing / changing: 2.52 × 2.376 m · 5.988 m² · 14.37 m³

Material quantities

Timber geometric and part quantities are m³; stock and reserve are pieces. Other stock counts are NOT_CALCULATED. Layer area and volume are alternative views: price only one basis. Optional prices use your chosen consistent currency.

timber-external

Geometric consumption
6.69 m3
Required parts
7.551 m3
Purchased stock
70 pieces
Cutting offcuts
1.894 m3
Kerf waste
0.005 m3
Additional reserve
4 piece
Inspect 70 stock pieces and cutting

timber-partitions

Geometric consumption
1.672 m3
Required parts
1.908 m3
Purchased stock
22 pieces
Cutting offcuts
0.07 m3
Kerf waste
0.003 m3
Additional reserve
2 piece
Inspect 22 stock pieces and cutting

sealing

Geometric consumption
434.692 m
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
21.735 m

floor-boards

Geometric consumption
20.282 m2
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
1.014 m2

floor-boards-volume

Geometric consumption
0.568 m3
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
0.028 m3

ceiling-insulation

Geometric consumption
20.282 m2
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
1.014 m2

ceiling-insulation-volume

Geometric consumption
3.042 m3
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
0.152 m3

lining-lining

Geometric consumption
75.645 m2
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
3.782 m2

lining-lining-volume

Geometric consumption
0.908 m3
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
0.045 m3

roof-covering

Geometric consumption
33.499 m2
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
1.675 m2

roof-eaves

Geometric consumption
13.2 m
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
0.66 m

roof-ridge

Geometric consumption
6.6 m
Required parts
NOT_CALCULATED
Purchased stock
NOT_CALCULATED
Cutting offcuts
NOT_CALCULATED
Kerf waste
NOT_CALCULATED
Additional reserve
0.33 m

Incomplete cost and uncalculated work

No prices entered.

  • Foundation type, depth and reinforcement
  • Roof framing, gable infill / mono-pitch high-wall infill
  • Corner joinery, connections, lintels and fastening
  • Labor, delivery and utilities
  • Stove, chimney and engineering systems
  • Moisture, drainage and fire protection
  • Terrace construction and roof
  • sealing: purchased stock layout
  • floor-boards: purchased stock layout
  • floor-boards-volume: purchased stock layout
  • ceiling-insulation: purchased stock layout
  • ceiling-insulation-volume: purchased stock layout
  • lining-lining: purchased stock layout
  • lining-lining-volume: purchased stock layout
  • roof-covering: purchased stock layout
  • roof-eaves: purchased stock layout
  • roof-ridge: purchased stock layout
Template and calculation assumptions
  • Rectangular single-storey timber shell; no corner tails or structural joinery allowance.
  • North/south walls run full length. East/west walls fit between them. Partitions butt against walls; intersections counted once.
  • Internal doors are centered on each partition. Custom openings use offsets from the wall segment start.
  • No structural, moisture, fire or regional sauna compliance verification.
  • Front vestibule occupies 34% of interior depth; rear separate steam room and combined washing/changing room split at 55% of interior length. Combined describes the washing/changing function; the steam room remains separate.
  • Courses are rounded up; boundary-course trimming is retained in the part allowance. Net geometric volume excludes openings exactly.
  • Partition stock has its own section; stock bins and reserve are separate from external-wall timber.
  • Joins, if enabled, are length accounting only and require separate design verification.

Compare valid variants (3)

Lowest timber consumption among shown variants: BAT-02. Compare layouts and material groups before choosing.

BAT-01

Vestibule / changing: 6.977 m²

Steam room: 7.318 m²

Washing / changing: 5.988 m²

Timber: 8.362 m³

Stock: 92 pieces

Offcuts: 1.964 m³

Additional timber reserve: 6 pieces

Partial cost: Unpriced

All material groups

timber-external: 6.69 m3; reserve 4 piece; stock 70

timber-partitions: 1.672 m3; reserve 2 piece; stock 22

sealing: 434.692 m; reserve 21.735 m; stock NOT_CALCULATED

floor-boards: 20.282 m2; reserve 1.014 m2; stock NOT_CALCULATED

floor-boards-volume: 0.568 m3; reserve 0.028 m3; stock NOT_CALCULATED

ceiling-insulation: 20.282 m2; reserve 1.014 m2; stock NOT_CALCULATED

ceiling-insulation-volume: 3.042 m3; reserve 0.152 m3; stock NOT_CALCULATED

lining-lining: 75.645 m2; reserve 3.782 m2; stock NOT_CALCULATED

lining-lining-volume: 0.908 m3; reserve 0.045 m3; stock NOT_CALCULATED

roof-covering: 33.499 m2; reserve 1.675 m2; stock NOT_CALCULATED

roof-eaves: 13.2 m; reserve 0.66 m; stock NOT_CALCULATED

roof-ridge: 6.6 m; reserve 0.33 m; stock NOT_CALCULATED

BAT-02

Rest room: 9.946 m²

Steam room: 5.242 m²

Washing room: 5.242 m²

Timber: 8.011 m³

Stock: 88 pieces

Offcuts: 1.999 m³

Additional timber reserve: 5 pieces

Partial cost: Unpriced

All material groups

timber-external: 6.69 m3; reserve 4 piece; stock 70

timber-partitions: 1.321 m3; reserve 1 piece; stock 18

sealing: 409.804 m; reserve 20.49 m; stock NOT_CALCULATED

floor-boards: 20.429 m2; reserve 1.021 m2; stock NOT_CALCULATED

floor-boards-volume: 0.572 m3; reserve 0.029 m3; stock NOT_CALCULATED

ceiling-insulation: 20.429 m2; reserve 1.021 m2; stock NOT_CALCULATED

ceiling-insulation-volume: 3.064 m3; reserve 0.153 m3; stock NOT_CALCULATED

lining-lining: 68.618 m2; reserve 3.431 m2; stock NOT_CALCULATED

lining-lining-volume: 0.823 m3; reserve 0.041 m3; stock NOT_CALCULATED

roof-covering: 33.499 m2; reserve 1.675 m2; stock NOT_CALCULATED

roof-eaves: 13.2 m; reserve 0.66 m; stock NOT_CALCULATED

roof-ridge: 6.6 m; reserve 0.33 m; stock NOT_CALCULATED

BAT-03

Rest room: 7.798 m²

Steam room: 7.25 m²

Washing room: 5.25 m²

Timber: 8.328 m³

Stock: 92 pieces

Offcuts: 2.003 m³

Additional timber reserve: 6 pieces

Partial cost: Unpriced

All material groups

timber-external: 6.69 m3; reserve 4 piece; stock 70

timber-partitions: 1.638 m3; reserve 2 piece; stock 22

sealing: 432.244 m; reserve 21.612 m; stock NOT_CALCULATED

floor-boards: 20.297 m2; reserve 1.015 m2; stock NOT_CALCULATED

floor-boards-volume: 0.568 m3; reserve 0.028 m3; stock NOT_CALCULATED

ceiling-insulation: 20.297 m2; reserve 1.015 m2; stock NOT_CALCULATED

ceiling-insulation-volume: 3.045 m3; reserve 0.152 m3; stock NOT_CALCULATED

lining-lining: 74.954 m2; reserve 3.748 m2; stock NOT_CALCULATED

lining-lining-volume: 0.899 m3; reserve 0.045 m3; stock NOT_CALCULATED

roof-covering: 33.499 m2; reserve 1.675 m2; stock NOT_CALCULATED

roof-eaves: 13.2 m; reserve 0.66 m; stock NOT_CALCULATED

roof-ridge: 6.6 m; reserve 0.33 m; stock NOT_CALCULATED

Example and dimensions

Editable example: 6 × 4 m, wall height 2.4 m, 150 × 150 mm timber, 140 mm working course height, 6 m stock and 3 mm kerf. A 4 × 1.5 m terrace remains separate.

Required inputs

External dimensions, timber section and course height, room preferences, doors/windows, partitions, slope, overhang, layers, reserve and optional user prices.

Formulas and assumptions

Clean interior excludes two wall thicknesses and partitions. Areas and volumes come from the same room rectangles as SVG. Courses round up; exact opening volume is removed geometrically, while boundary-course parts keep site-trimming allowance.

Geometric consumption, parts, stock, offcuts, kerf and user reserve are separate. Stock without a layout algorithm is NOT_CALCULATED. Fasteners are preliminary estimates from explicit spacing and connection-count assumptions. Prices come from the user; labor, delivery, utilities and unpriced items are excluded.

Limitations

No structural, foundation, stove, chimney or fire-clearance design. Roof framing, joinery and terrace construction remain uncalculated.

Related calculators

These links do not select structural solutions. Foundation dimensions require independent specification.