timber-external
- Geometric consumption
- 6.69 m3
- Required parts
- 7.551 m3
- Purchased stock
- 70 pieces
- Cutting offcuts
- 1.894 m3
- Kerf waste
- 0.005 m3
- Additional reserve
- 4 piece
Sketch layout and preliminary material estimate
Structural solutions require separate verification.
Editable educational example. All dimensions and assumptions can be changed. This is not a ready construction design.
v1.0.0 · Geometry checked · Quantity checked · Engineering unverified
White = doors; blue = windows. All annotations in metres. Room dimensions exclude wall and partition thickness.
Timber geometric and part quantities are m³; stock and reserve are pieces. Other stock counts are NOT_CALCULATED. Layer area and volume are alternative views: price only one basis. Optional prices use your chosen consistent currency.
No prices entered.
Lowest timber consumption among shown variants: BAT-02. Compare layouts and material groups before choosing.
Vestibule / changing: 6.977 m²
Steam room: 7.318 m²
Washing / changing: 5.988 m²
Timber: 8.362 m³
Stock: 92 pieces
Offcuts: 1.964 m³
Additional timber reserve: 6 pieces
Partial cost: Unpriced
timber-external: 6.69 m3; reserve 4 piece; stock 70
timber-partitions: 1.672 m3; reserve 2 piece; stock 22
sealing: 434.692 m; reserve 21.735 m; stock NOT_CALCULATED
floor-boards: 20.282 m2; reserve 1.014 m2; stock NOT_CALCULATED
floor-boards-volume: 0.568 m3; reserve 0.028 m3; stock NOT_CALCULATED
ceiling-insulation: 20.282 m2; reserve 1.014 m2; stock NOT_CALCULATED
ceiling-insulation-volume: 3.042 m3; reserve 0.152 m3; stock NOT_CALCULATED
lining-lining: 75.645 m2; reserve 3.782 m2; stock NOT_CALCULATED
lining-lining-volume: 0.908 m3; reserve 0.045 m3; stock NOT_CALCULATED
roof-covering: 33.499 m2; reserve 1.675 m2; stock NOT_CALCULATED
roof-eaves: 13.2 m; reserve 0.66 m; stock NOT_CALCULATED
roof-ridge: 6.6 m; reserve 0.33 m; stock NOT_CALCULATED
Rest room: 9.946 m²
Steam room: 5.242 m²
Washing room: 5.242 m²
Timber: 8.011 m³
Stock: 88 pieces
Offcuts: 1.999 m³
Additional timber reserve: 5 pieces
Partial cost: Unpriced
timber-external: 6.69 m3; reserve 4 piece; stock 70
timber-partitions: 1.321 m3; reserve 1 piece; stock 18
sealing: 409.804 m; reserve 20.49 m; stock NOT_CALCULATED
floor-boards: 20.429 m2; reserve 1.021 m2; stock NOT_CALCULATED
floor-boards-volume: 0.572 m3; reserve 0.029 m3; stock NOT_CALCULATED
ceiling-insulation: 20.429 m2; reserve 1.021 m2; stock NOT_CALCULATED
ceiling-insulation-volume: 3.064 m3; reserve 0.153 m3; stock NOT_CALCULATED
lining-lining: 68.618 m2; reserve 3.431 m2; stock NOT_CALCULATED
lining-lining-volume: 0.823 m3; reserve 0.041 m3; stock NOT_CALCULATED
roof-covering: 33.499 m2; reserve 1.675 m2; stock NOT_CALCULATED
roof-eaves: 13.2 m; reserve 0.66 m; stock NOT_CALCULATED
roof-ridge: 6.6 m; reserve 0.33 m; stock NOT_CALCULATED
Rest room: 7.798 m²
Steam room: 7.25 m²
Washing room: 5.25 m²
Timber: 8.328 m³
Stock: 92 pieces
Offcuts: 2.003 m³
Additional timber reserve: 6 pieces
Partial cost: Unpriced
timber-external: 6.69 m3; reserve 4 piece; stock 70
timber-partitions: 1.638 m3; reserve 2 piece; stock 22
sealing: 432.244 m; reserve 21.612 m; stock NOT_CALCULATED
floor-boards: 20.297 m2; reserve 1.015 m2; stock NOT_CALCULATED
floor-boards-volume: 0.568 m3; reserve 0.028 m3; stock NOT_CALCULATED
ceiling-insulation: 20.297 m2; reserve 1.015 m2; stock NOT_CALCULATED
ceiling-insulation-volume: 3.045 m3; reserve 0.152 m3; stock NOT_CALCULATED
lining-lining: 74.954 m2; reserve 3.748 m2; stock NOT_CALCULATED
lining-lining-volume: 0.899 m3; reserve 0.045 m3; stock NOT_CALCULATED
roof-covering: 33.499 m2; reserve 1.675 m2; stock NOT_CALCULATED
roof-eaves: 13.2 m; reserve 0.66 m; stock NOT_CALCULATED
roof-ridge: 6.6 m; reserve 0.33 m; stock NOT_CALCULATED
Editable example: 6 × 4 m, wall height 2.4 m, 150 × 150 mm timber, 140 mm working course height, 6 m stock and 3 mm kerf. A 4 × 1.5 m terrace remains separate.
External dimensions, timber section and course height, room preferences, doors/windows, partitions, slope, overhang, layers, reserve and optional user prices.
Clean interior excludes two wall thicknesses and partitions. Areas and volumes come from the same room rectangles as SVG. Courses round up; exact opening volume is removed geometrically, while boundary-course parts keep site-trimming allowance.
Geometric consumption, parts, stock, offcuts, kerf and user reserve are separate. Stock without a layout algorithm is NOT_CALCULATED. Fasteners are preliminary estimates from explicit spacing and connection-count assumptions. Prices come from the user; labor, delivery, utilities and unpriced items are excluded.
No structural, foundation, stove, chimney or fire-clearance design. Roof framing, joinery and terrace construction remain uncalculated.
These links do not select structural solutions. Foundation dimensions require independent specification.