posts
- Geometric consumption
- 0.216 m3
- Required parts
- 9 $count
- Purchased stock
- 5 piece
- Cutting offcuts
- 0.084 m3
- Kerf waste
- 0 m3
- Additional reserve
- 1 piece
Sketch layout and preliminary material estimate
Structural solutions require separate verification.
Editable educational example. All dimensions and assumptions can be changed. This is not a ready construction design.
v1.0.0 · Geometry checked · Quantity checked · Engineering unverified
Required parts are counts; geometric timber quantities are volumes. Stock and reserve are separate pieces. Area and volume rows are alternative views: price only one basis.
PRELIMINARY ESTIMATE
5 × 1; Overlap area: 1.55 m²; Offcuts: 1.311 m²
5 × 1; Overlap area: 1.55 m²; Offcuts: 1.311 m²
No prices entered.
No market prices; costs omit labor, delivery, utilities and unpriced items.
GAZ-03: Select at least one railing side.
Reported footprint: 12 m²
Deck area: 12 m²
Usable area: 12 m²
Roof area: 17.378 m²
posts: 0.216 m3; Stock: 5; reserve 1 piece; Offcuts: 0.084
beams: 0.204 m3; Stock: 3; reserve 1 piece; Offcuts: 0.066
rafters: 0.232 m3; Stock: 6; reserve 1 piece; Offcuts: 0.038
joists: 0.18 m3; Stock: 8; reserve 1 piece; Offcuts: 0.18
boards: 0.329 m3; Stock: 21; reserve 2 piece; Offcuts: 0.164
roof-covering: 17.378 m2; Stock: 10; reserve 1 piece; Offcuts: 2.622
deck-fasteners: 336 count; Stock: 336; reserve 17 piece; Offcuts: NOT_CALCULATED
roof-fasteners: 80 count; Stock: 80; reserve 4 piece; Offcuts: NOT_CALCULATED
Partial cost: Unpriced
Reported footprint: 12 m²
Deck area: 12 m²
Usable area: 12 m²
Roof area: 17.378 m²
posts: 0.277 m3; Stock: 6; reserve 1 piece; Offcuts: 0.082
beams: 0.213 m3; Stock: 3; reserve 1 piece; Offcuts: 0.057
rafters: 0.232 m3; Stock: 8; reserve 1 piece; Offcuts: 0.128
joists: 0.18 m3; Stock: 8; reserve 1 piece; Offcuts: 0.18
boards: 0.329 m3; Stock: 21; reserve 2 piece; Offcuts: 0.164
roof-covering: 17.378 m2; Stock: 10; reserve 1 piece; Offcuts: 2.622
deck-fasteners: 336 count; Stock: 336; reserve 17 piece; Offcuts: NOT_CALCULATED
roof-fasteners: 80 count; Stock: 80; reserve 4 piece; Offcuts: NOT_CALCULATED
Partial cost: Unpriced
Editable example: 4 × 3 m, low eave 2.4 m, deck level 0.2 m, 25° roof slope and 0.25 m overhang. Post spacing 2 m; rafter/joist spacing 0.6 m; 6 m stock.
Length, width, eave/deck heights, roof, post/beam/rafter profiles, spacing, floor boards/panels, entrance, supported railing sides, rear privacy wall, usable/physical roofing dimensions, waste and optional user prices.
The ridge runs along length; slope runs across width. Roof area equals (length + 2 overhang) × (width + 2 overhang) / cos(slope). Both endpoints are included in repeated-member runs. Posts frame the entrance gap. Each profile has its own cutting pool. Roofing uses a complete rectangular grid on each plane, with overlaps and trim reported separately.
Geometric consumption, parts, stock, offcuts, kerf and user reserve are separate. Stock without a layout algorithm is NOT_CALCULATED. Fasteners are preliminary estimates from explicit spacing and connection-count assumptions. Prices come from the user; labor, delivery, utilities and unpriced items are excluded.
GAZ-01 is open with gable roof and optional deck. GAZ-02 requires a deck and mono-pitch roof; a rear privacy wall is optional. GAZ-03 requires a deck and selected railing zones with an entrance gap. Loads, foundations, anchors and connection capacities are not designed.
These links do not select structural solutions. Foundation dimensions require independent specification.