Floor Screed Calculator

Estimate screed volume and the mass of material needed for a floor, based on area, layer thickness and density.

Units

No results yet.

Formula and method

Volume is floor area multiplied by thickness. Multiplying the volume by the mixed density gives the mass of material required, before the waste allowance is added.

The deepest point decides the amount, not the average

A screed is ordered by volume, but it is levelled by its highest point. If the slab falls 15 mm across a room, the thin end still has to reach the finished level, so the thick end becomes the governing thickness and the average depth is what you end up paying for. Measuring the middle of the room and multiplying by the nominal 40 mm is how floors come up short.

Take levels on a grid of roughly one metre and use the highest reading. On a 20 m² room that is 0.4 m³ at 40 mm, but a 15 mm fall turns it into about 0.55 m³ — a third more sand, cement and bags than the drawing suggests.

Drying time and the thickness per pass

Sand-cement screed dries at roughly 4 mm per week up to 50 mm, and slower beyond that; a 60 mm screed needs about four months before a moisture-sensitive floor can go down. Liquid screeds are faster because they carry less water, but they still need a moisture test before the finished floor is laid, and the test costs less than lifting a swollen laminate.

Thickness also limits the pass. Bonded screed below 25 mm tends to debond, unbonded screed needs 50 mm or more over a separating membrane, and floating screed over insulation starts around 65 mm. The calculator reports the volume for the thickness you enter, so the number to check first is the construction, not the arithmetic.

Density, mass and what the bags tell you

Screed density of about 1800 kg/m³ is what turns a volume into the mass a structural engineer cares about: 0.55 m³ is roughly one tonne spread over 20 m². If you mix on site, the calculator's mass figure is the one to use when buying sand and cement by weight rather than by bag count.

Ready-mixed bags are sold by weight with a stated yield, and that yield assumes the exact water ratio. Adding water to make it flow further reduces strength and increases shrinkage, which is exactly the failure the steel mesh is there to control.

  • Use the highest level reading as the thickness, not the nominal one.
  • Sand-cement dries about 4 mm per week; test for moisture before laying the floor.
  • 1800 kg/m³ converts your volume into the mass of sand and cement.

How to measure the inputs

  1. Measure the floor at its longest and widest points.
  2. Confirm the design thickness in millimetres and enter it in your chosen unit.
  3. Take density from the product datasheet rather than assuming a value.

Worked example

Room length 13.12 ft; Room width 16.4 ft; Thickness 1.97 in; Density (optional) 1,800 kg/m³; Waste 10 % → Screed mass: 4,365.15 lb

Reference data

Screed mix per square metre
Thickness, mmMix, kg/m²25 kg bags per 10 m²
305422
407229
509036
6010844

Assumes 1.8 kg per m² per mm of thickness — the density of a cement screed.

Practical tips

  • Order sand, cement or ready-mixed screed slightly ahead of the pour day.
  • Keep a record of the batch mix so the next floor matches.
  • Allow the screed to cure before laying a finished floor on top.

Sources

  • СП 29.13330.2011 — Полы
  • EN 13813 — Screed material

Checked and updated October 22, 2026